- Overview
- Product Description
- Detailed Photos
- Product Parameters
- Our Advantages
- Packaging & Shipping
- Exhibition
- FAQ
Basic Info.
Product Description

Model | power | Steam consumption | Dimension(m) | Worker |
30,000pieces/8h | 50kw | 1000-1200KG/H | 50*5*4 | 4 |
60,000pieces/8h | 65kw | 1500-1700KG/H | 55*5*4 | 4 |
80,000pieces/8h | 80kw | 2000-2200KG/H | 65*6*4 | 5 |
120,000pieces/8h | 95kw | 2400-2600KG/H | 75*6*4 | 5 |
160,000pieces/8h | 115kw | 2800-3000KG/H | 85*7*4.5 | 5 |
200,000pieces/8h | 130kw | 3200-3400KG/H | 95*8*4.5 | 6 |
250,000pieces/8h | 140kw | 3600-3800KG/H | 105*8*4.5 | 6 |
300,000pieces/8h | 155kw | 3800-4000KG/H | 120*10*4.5 | 6 |

Q What's the difference between fried instant noodle and dried noodle?
A Fried instant noodle has oil ,we can put noodle into hot water and just wait 2-3 minutes,then can eator just eat noodle directly without adding water. Dried noodle need be boiled.
Q Noodle shape and machine capacity ?
A There are two shapes, square and round shape. Capacity is from 20,000 pieces to 300,000pieces 8 hours.Workshop need 30 to 90 meters long.
Q Instant noodle line steam and electric consumption ?
A Accord different capacity, steam comsumption is from 1000kg/hour to 3500kg/hour Electric consumption is from 40kw to 150kw .
Q You are a trading company or manufacturer ?
A We are real factory which has over 30 years experience for making noodle machine.Our factory locate in Keii road 16th.Mazhai industrial Zone,Eergi District.Zhengzhou City,Henan Province,China which near Xinzheng Internationa Airport.
Q Noodle machine delivery time?
A Delivery time is 45-60 days for single machineDelivery time is 60-90 days for whole production line